Environmental Contamination
- Phase I and II Environmental Site Assessments (ESAs) Due Diligence
- Site-remedial investigation and Feasibility Study (FS), and design including multiple National Priorities List (NPL) Superfund sites
- Aquifer testing and hydrogeologic studies
- Vapor intrusion assessment
- Risk-based assessment
- Wisconsin Drycleaner Environmental Response Fund (DERF) and Petroleum Environmental Clean Up Fund Act (PECFA) claims
- Aboveground/Underground Storage Tank (AST/UST) removal, investigation, and remediation
- Underground Injection Control (UIC) system removal, upgrade, and storm water management
- Brownfield redevelopment
- Field tasks (well installation; collection of rock, soil, sediment, soil vapor, subslab, indoor air, groundwater and surface water samples; waste profiling and removal coordination)
Environmental Engineering
- Site evaluation, application of evaluation results, and cost analysis
- Remedy construction oversight, operations, maintenance, and monitoring
- Pilot testing through full-scale remedy design and implementation
- Design services (pavement design, impoundment liner design, landfill cover design, embankment design)
- Evaluation and selection of treatment options and waste disposal
- Remediation system design, operation and maintenance, monitoring, and evaluation
- Remediation performance assessment
- Hydrologic evaluations
- Storm water assessment and design
|